
Movie in production
In current Traffic
Bobby (71) commutes on the Westautobahn between Vienna and Salzburg to visit his friend Arthur on his deathbed. He takes along strangers who find his rides through an online carpooling platform. One evening, he gets stranded at an overgrown rest area with Lana (32) and Cliff (38). Night falls and Bobby begins to talk about Arthur, whose life always remained an unsolved mystery for him: “He never called it by its name, but always just said ‘village’ – and that it was under the motorway, which ran on a bridge above it.
Data
- Category
- Feature documentary
- Financing
- Nationaler Film
- Format
- Digit., 100 Min
- Funding Film Institute
- 228.094 €
- Share of total production costs
- 22 %
- Funding ÖFI+
- 320.000 €
- Share of total production costs
- 30 %
- Television investment
- 100.000 €
- Funding program
- ÖFI, ÖFI+
- Status
- in production
- Further information
- Green Film Consultant: Richard Wagner
- Film location
- Vienna, Lower Austria, Upper Austria, Salzburg
- Shooting time
- September 2023 - June 2024
- Days of shooting
- 45
- Completion
- Fall 2025
- Funding institutions Austria
- Filminstitut, Filmfonds Wien, Land Oberösterreich
Credits
- Production
- PANAMA Film KG
- Producer
- Lixi Frank, David Bohun
- Director
- Sebastian Brameshuber
- Script
- Sebastian Brameshuber, Ko-Autorin: Anna Lehner
- DOP
- Klemens Hufnagl, Patrick Wally
- Editor
- Dane Komljen, Sebastian Brameshuber
- Sound engineer
- Matthias Kassmannhuber, Nora Czamler
- Sound design
- Aleksa Stojanovic
- Costume design
- Barbara Palomino Ruiz
- Set design
- Barbara Palomino Ruiz
- Cast
- Bobby Sommer (Bobby), Clifford Agu (Cliff), Lana Prerad (Lana)
- Production manager
- Saskia Arth
- German Title
- Bei aktueller Verkehrslage
- Television investment
- ORF (Film/Fernseh-Abkommen)